Temporary Works Design
- Preparation of a proposed construction sequence in the form of drawings.
- Development of sequence with details to ensure adequate support to all existing structure is provided during each construction stage.
- Preparation of accompanying method statements as appropriate.
- Site visits to support the temporary works co-ordinator
- Basement propping and top-down construction sequences
- Category 1,2 and 3 design checks to BS 5975