Temporary Works Design

  • Preparation of a proposed construction sequence in the form of drawings.
  • Development of sequence with details to ensure adequate support to all existing structure is provided during each construction stage.
  • Preparation of accompanying method statements as appropriate.
  • Site visits to support the temporary works co-ordinator
  • Basement propping and top-down construction sequences
  • Category 1,2 and 3 design checks to BS 5975